EP 3167413 A1 20170517 - ENERGY MANAGEMENT METHOD AND ENERGY MANAGEMENT DEVICE FOR A RESIDENTIAL COMPLEX WITH ONE OR MORE RESIDENTIAL UNITS OR FOR A CITY AREA
Title (en)
ENERGY MANAGEMENT METHOD AND ENERGY MANAGEMENT DEVICE FOR A RESIDENTIAL COMPLEX WITH ONE OR MORE RESIDENTIAL UNITS OR FOR A CITY AREA
Title (de)
ENERGIEMANAGEMENTVERFAHREN UND ENERGIEMANAGEMENTVORRICHTUNG FÜR EINE WOHNANLAGE MIT EINER ODER MEHREREN WOHNEINHEITEN ODER EIN STADTQUARTIER
Title (fr)
PROCÉDÉ DE GESTION D'ÉNERGIE ET DISPOSITIF DE GESTION D'ÉNERGIE POUR UN ENSEMBLE D'HABITATIONS AVEC UNE OU PLUSIEURS UNITÉ D'HABITATION OU POUR UN QUARTIER URBAIN
Publication
Application
Priority
- DE 102014010071 A 20140708
- EP 2015065610 W 20150708
Abstract (en)
[origin: WO2016005451A1] The invention relates to an energy management method and an energy management device for a residential complex with one or more residential units or for a city area with a common connection, via which domestic electricity of a generation capacity that can vary over time is supplied to the public power grid of a decentralized domestic electricity generating device and to the residential complex or the city area from the public power grid via the grid power. The method is designed such that the demand not covered by the decentralized domestic electricity generating device corresponding to the degree of the supply 1-S of power from the power grid and the demand covered by the decentralized domestic electricity generating device corresponding to the degree of self-sufficient electricity S of the residential complex or the city area are ascertained; a time dependency of the power usage of a residential unit is detected; and power costs for the residential unit of the residential complex or the city area are ascertained while taking into consideration the ascertained time dependency of the degree of the supply of power from the power grid and the degree of self-sufficient electricity and the detected time dependency of the power usage of the residential unit and the respective rates for grid power and domestic electricity.
IPC 8 full level
G06Q 10/06 (2012.01); G06Q 50/06 (2012.01)
CPC (source: EP US)
G01R 21/001 (2013.01 - US); G01R 21/1331 (2013.01 - US); G06Q 10/06 (2013.01 - EP US); G06Q 50/06 (2013.01 - EP US); H02J 3/34 (2013.01 - US); Y02B 70/30 (2013.01 - EP); Y02B 70/3225 (2013.01 - EP); Y04S 20/222 (2013.01 - EP); Y04S 20/242 (2013.01 - EP)
Citation (search report)
See references of WO 2016005451A1
Designated contracting state (EPC)
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR
Designated extension state (EPC)
BA ME
DOCDB simple family (publication)
WO 2016005451 A1 20160114; DE 102014010071 A1 20160114; EP 3167413 A1 20170517; US 2017161847 A1 20170608
DOCDB simple family (application)
EP 2015065610 W 20150708; DE 102014010071 A 20140708; EP 15736244 A 20150708; US 201515324324 A 20150708